Prokurent Kancelaria Radcow Prawnych i AdwokatowProkurent Kancelaria Radcow Prawnych i AdwokatowProkurent Kancelaria Radcow Prawnych i AdwokatowProkurent Kancelaria Radcow Prawnych i Adwokatow
  • MAGAZYNY ENERGII
  • 35-LECIE
  • KANCELARIA
    • O nas
    • Zespół
    • Rekrutacja i Kariera
  • USŁUGI
  • AKTUALNOŚCI
  • KONTAKT
  • UA
  • MAGAZYNY ENERGII
  • 35-LECIE
  • KANCELARIA
    • O nas
    • Zespół
    • Rekrutacja i Kariera
  • USŁUGI
  • AKTUALNOŚCI
  • KONTAKT
  • UA
  • Polityka Prywatności
✕
Cable Pooling
  • Home
  • Aktualności
  • Energy storage
  • Cable Pooling
Kategorie
  • Energy storage
Tagi

As of October 1, 2023, regulations allowing the sharing of a connection by multiple generation installations, known as cable pooling, came into effect. It involves utilizing the transmission capacity of existing or new network connections, for example, in the case of an existing wind power plant, to launch a photovoltaic power plant at the same location. In such a case, both the wind and solar farms share the energy infrastructure and use a common connection. This mechanism aims to facilitate the sustainable increase of installed capacity in various renewable energy installations.

Advantages of Cable Pooling:

  1. Increased connection capabilities;

Cable pooling allows for more efficient use of existing network infrastructure, which can contribute to an increase in the number of renewable energy installations connected to the grid. This makes it possible to counter the stagnation in the growth of installed capacity due to the lack of available connections.

  • Optimization of network operation management;

Integration of various renewable energy sources, such as wind and solar, allows for better management of energy flows, which can lead to a reduction in losses resulting from non-market power redispatching. Cable pooling can facilitate the balancing of electrical energy supply and demand, which is crucial for network stability.

  • Support for energy storage systems;

Cable pooling can accelerate and streamline the process of connecting energy storage systems, which is important for network stabilization and the integration of renewable energy sources. Energy storage systems play a key role in compensating for the instability of energy production from renewable sources. Energy storage systems compensate for power surpluses generated due to significantly higher installed capacity compared to connection capacity (the ratio of these capacities sometimes reaches 2). During short periods of high energy generation from both types of installed energy sources, energy storage systems can absorb the surplus to avoid exceeding connection capacity and to prevent wasting energy in case of a potential need to shut down part or all of the source. Stored energy can be released when the generated power drops below the connection capacity and during periods of significantly higher energy prices than those occurring during maximum source generation.

  • Increase in energy generation from renewable sources during periods of low sunlight;

Thanks to the ability to combine different types of renewable energy installations, including those based on wind energy, it is possible to increase energy generation during periods of low sunlight, allowing for more stable energy supplies.

  • Optimization of the use of connection infrastructure and reduction of capital expenditure (CAPEX);

The application of cable pooling allows for a significant reduction in project costs calculated per unit of energy fed into the grid. This means that when building infrastructure for e.g. 1 MW for a photovoltaic farm, the utilization factor of the infrastructure’s capacity will be relatively low. With approximately the same power output infrastructure to the grid, under the current legal situation, we can add a second farm, this time wind-based, and ideally also an energy storage system. In this case, the utilization factor of the infrastructure built for a maximum power of 1 MW will be significantly higher. With similar costs associated with grid connection, we gain the ability to multiply energy production and thus profits from energy sales.

Disadvantages of Cable Pooling:

  1. The necessity for operators to pay an advance deposit;

Despite the lack of significant increase in connection capacity and minimal connection costs, grid operators may require applicants to pay an advance deposit towards the connection fee.

  • The requirement to adapt existing installations to new regulations;

There is a possibility that existing and connected installations will need to be adapted to the requirements of Commission Regulation 2016/631 (“NC RfG”). This may lead to additional costs and technical complications, especially if these installations were designed according to earlier standards.

  • Time constraints regarding connection possibilities;

The connection of RES installations within cable pooling is only possible if the first installation was connected or had connection conditions issued after October 1, 2023.

  • Lack of transparency in the process of verifying technical connection conditions;

The process of verifying the existence of technical conditions for network connection is not transparent. The non-disclosure of expert reports commissioned by operators to applicants hinders interested parties from assessing and understanding the technical aspects related to network connection.

Information from the President of the Energy Regulatory Office No. 15/2024 dated March 25, 2024.

In the aforementioned information, numerous issues raising doubts in the area of network connections were addressed, particularly concerning the issue of cable pooling.

The President of the Energy Regulatory Office, referring to issues related to cable pooling, pointed out, among other things, that:

the institution of shared connection infrastructure can be applied in situations where the application for connection conditions:

  • includes the initial connection to the grid of two or more renewable energy installations;
  • is submitted in cases where connection conditions have previously been issued for the “first” renewable energy installation and a connection agreement has been concluded, and the connected entity applies for the connection of a second or subsequent renewable energy installation;
  • concerns situations where a renewable energy installation is already connected to the grid, and the connected entity applies for the connection of a second or subsequent renewable energy installation.

This solution can be applied to renewable energy installations that were connected to the grid before October 1, 2023, as well as where connection conditions were issued and a connection agreement was concluded before this date;

  • Within the framework of shared connections, systems can be connected both of the same type of energy source (e.g., two photovoltaic systems) and of different types (e.g., wind system, photovoltaic, hydroelectric, or biogas plant);
  • If another installation is to be connected to the grid where a renewable energy installation is already connected, the requirements of the NC RfG regulation apply only to the new installation, unless the previous installation was modernized. This means that in shared connections, if the existing installation has not been modernized, the new regulations do not require changes to the existing installation.

The inability to connect energy storage systems within cable pooling prevents the effective utilization of already installed capacities.

In the context of connecting renewable energy source installations to the power grid with a nominal voltage higher than 1 kV, it is possible to connect two or more installations belonging to one or more entities at a single connection point. An exception is made for installations where the connection point to the grid is the end user’s installation.

For all renewable energy source installations connected in the aforementioned manner, uniform connection conditions are issued, and a single grid connection agreement is concluded. Such an agreement specifies the requirements concerning the location and technical parameters of the metering and settlement systems, which enable precise measurement of the amount of electrical energy fed into and drawn from the grid by each connected renewable energy source installation.

In the event that the connection capacity turns out to be lower than the total installed electrical capacity of all connected renewable energy source installations, the connection agreement must include a detailed description of the methods for securing technical capabilities to ensure that the connection capacity is not exceeded. Thus, this agreement serves as a tool not only regulating the connection conditions but also ensuring that the installations will operate in compliance with the technical requirements of the power grid.

An energy storage system can only be part of a renewable energy source installation if it is connected to devices used for electrical energy generation. Conversely, cable pooling is only possible for connecting renewable energy source installations to the grid. An energy storage system that is not part of a renewable energy source installation cannot, therefore, be connected to the grid in a shared connection model.


If you have any questions or concerns regarding the above matter, please do not hesitate to contact our experts:

Piotr Włodawiec: wlodawiec[at]prokurent.com

Łukasz Moczydłowski: moczydlowski [at] prokurent.com

Paweł Wróblewski: 'p.wroblewski [at] elbudbis.pl


Authors:

Piotr Włodawiec – Attorney-at-law / Senior Partner

Łukasz Moczydłowski – Attorney-at-law / Senior Partner

Paweł Wróblewski – CEO ElbudBis

Relkonds

Material prepared in collaboration with:

Udostępnij

Powiązane wpisy

28 kwietnia 2025

Taxation of energy storage systems


Czytaj więcej
23 kwietnia 2025

Network flexibility services


Czytaj więcej
22 kwietnia 2025

Distribution systems


Czytaj więcej
17 kwietnia 2025

Dynamic pricing


Czytaj więcej

Wyszukaj

✕

Najnowsze wpisy

  • Specustawa biogazowa: Walor dokumentacji projektowej względem urzędniczej wykładni językowej przepisu
    18 czerwca 2025
  • Test zaspokojenia wierzycieli to też koszt restrukturyzacji
    16 czerwca 2025
  • Światowy Dzień Mięsa 2025 – jesteśmy częścią tej historii!
    12 czerwca 2025
  • Próg 250 pracowników nie będzie już tak krępował biznesu
    10 czerwca 2025
  • Specustawa biogazowa: Powierzchnia zabudowy
    3 czerwca 2025

Kategorie

  • Alert COVID-19 (23)
  • Energy storage (21)
  • Magazyny energii (21)
  • Nowości (279)
  • Warto wiedzieć (162)
  • Wydarzenia (14)

Tagi

  • #WBG2018
  • Adwokaci Kancelarii Prokurent wygrywają
  • Afrykański Pomór Świń
  • Agencja Rynku Rolnego
  • Agri-Food.pl
  • Akadaemia Piłkarska
  • Alert
  • Aplikant Adwokacki
  • Aplikant Radcowski
  • aport
  • areszt
  • areszt domowy
  • areszt tymczasowy
  • ARR
  • Artykuł
  • ASF
  • Batalion Reprezentacyjny Wojska Polskiego.
  • BCC Loża Siedlcecka
  • Bezpieczeństwo
  • bezpieczeństwo żywności i żywienia

Kancelaria prawnicza Prokurent powstała w 1989 roku w Warszawie. Od początku działalności świadczymy profesjonalną pomoc prawną głównie na rzecz przedsiębiorców, ale także osób fizycznych i organizacji pozarządowych. Zespół kancelarii tworzą prawnicy, którzy dzięki swojej wszechstronnej wiedzy i wieloletniemu doświadczeniu mogą zapewnić kompleksowe doradztwo prawne związane z działalnością gospodarczą polskich i zagranicznych firm, uwzględniając ich sytuację rynkową i dynamicznie zmieniające się otoczenie biznesowe.




PROKURENT
Kancelaria Radców Prawnych i Adwokatów
Makuliński Moczydłowski Rostafiński Włodawiec i Partnerzy
ul. Puławska 39 lok. 50
02-508 Warszawa
+22 854 06 57
+22 646 07 96
+22 854 06 59
kancelaria@prokurent.com

©2024 PROKURENT. All Rights Reserved

  • Polityka Prywatności
    Używamy plików Cookies
    Używamy cookies, aby ułatwić użytkownikom korzystanie z witryny oraz w celu tworzenia statystyk serwisu. Jeżeli nie blokujesz plików cookies, to zgadzasz się na ich używanie oraz zapisanie w pamięci urządzenia.Przeczytaj więcej

    AKCEPTUJĘ
    Manage consent

    Privacy Overview

    This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
    Necessary
    Always Enabled
    Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
    CookieDurationDescription
    cookielawinfo-checbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
    cookielawinfo-checbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
    cookielawinfo-checbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
    cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
    cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
    viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
    SAVE & ACCEPT